Derrick Structure & Piperack Bridge, Oil & Gas Industry
- Scope: Design of Derrick platform & Piperack, Pile & Civil foundation design.
- Deliverables: Pile foundation calculations, Steel structure designs.
- Period: Completed in 6 months.
Detailed Information
Derrick structure supporting platform inside Pond with Piperack bridge, Oil & Gas Industry
Scope of work:
- Structure design & drawing of Derrick supporting platform & Piperack bridge Pile foundation
- Piperack Steel structure design
- Civil foundation design for supporting Equipment & drums
Deliverables:
- Pile Foundation design, drawing & Calculation report for Derrick supporting platform & Approach bridge inside Pond area
- Open foundation design, drawing & design report for Piperack & supporting machine foundation on ground
- Steel structure design, drawing & design report for Pipe racks
- Misc. design, drawing & design report for Access platform, Roads, Pavement, Drains etc.
- Civil & Structure MTO
Engg. period: 6 months