Derrick Structure & Piperack Bridge, Oil & Gas Industry

  • Scope: Design of Derrick platform & Piperack, Pile & Civil foundation design.
  • Deliverables: Pile foundation calculations, Steel structure designs.
  • Period: Completed in 6 months.

Detailed Information

Derrick structure supporting platform inside Pond with Piperack bridge, Oil & Gas Industry

Scope of work:

  • Structure design & drawing of Derrick supporting platform & Piperack bridge Pile foundation
  • Piperack Steel structure design
  • Civil foundation design for supporting Equipment & drums

Deliverables:

  • Pile Foundation design, drawing & Calculation report for Derrick supporting platform & Approach bridge inside Pond area
  • Open foundation design, drawing & design report for Piperack & supporting machine foundation on ground
  • Steel structure design, drawing & design report for Pipe racks
  • Misc. design, drawing & design report for Access platform, Roads, Pavement, Drains etc.
  • Civil & Structure MTO

Engg. period: 6 months

 

Leave a comment

Your email address will not be published. Required fields are marked *

where we specialize in delivering innovative and reliable structural solutions tailored to exceed industry standards.

Contact us

: info@aatreyengineering.com

: +91 78740 01444

302, Samruddhi Trade Centre, Nr. Bharat Petrol Pump, Waghodiya-Dabhoi Ring Road, Kendranagar, Vadodara, 390025 India

GST : 24AJSPD2300H1ZO

© 2024 Aatrey Engineering. All rights reserved.

Designed by Globelectra