Flare Package & QC Lab, Chemical Plant, Polymer Industry
- Scope: Detailed Civil – Structural design for foundations, concrete, floors, drains.
- Deliverables: Civil Design basis report, foundation drawings, BOQ.
- Period: Completed in 45 days.
Detailed Information
Civil – Structural design engineering for Flare package & QC Lab development at Chemical Plant, Polymer Industry
- Scope of work:
- Design and prepare detailed drawings for all foundations, elevated concrete, floors, drains, etc., including arrangement, detailing of reinforcing, and piling
- Preparation of DBR Documents.
- Design & Provide the Fabrication detailed drawing of the Platform, Equipment Structure, Monorail, Staircase & any other structure as per the E & I/Vendor requirements
- Prepare foundation location plan and provide pile/open foundation details.
- Deliverables:
- Civil Design basis report
- Civil foundation drawings of Derrick structure, Pipe rack structure, Equipment & its Calculation report
- Civil Pavement, Road, drains, Cable trenches & pits etc. drawings and BOQ
- Engg. period: 45 days